 This past week or so has mostly been a continuation of previous projects among 3 different clients. A few drainage pipes installed and a few structures being constructed. Im finding myself enjoying the different relationships with clients as we get further along through projects. 


Our first project was the drainage issues on a clients yard, which was an unfortunate miss-match of large muddy low areas around the front of the property.


It was certainly interesting learning what goes into making the pipes a consistent slope. 
After running water through the whole system, it really made it clear why catch basins are so important while the built up mud was building up.

With a simple project done and dusted, we moved on to the most complex of the three projects.
We built upon the frame we set up a week ago fully flushed out the finer decorative elements.
The start 



A whole lot of nails 


A bit of siding 


A little vintage flair, shotgun house inspired.


And we finish it up in around 2 weeks.


Throw in a bonus pergola we threw up in a day as a last minute addition.



And on my last day there i saw a cute little snake :)


The last project we started today.


Today we put some Amercan Holly trees in, to partially cover a structural crack while it is repaired.