Philip Moser Associates - Mason Phillips 2
🔼🔼 Curtis ⬆️⬆️
This past week or so has mostly been a continuation of previous projects among 3 different clients. A few drainage pipes installed and a few structures being constructed. Im finding myself enjoying the different relationships with clients as we get further along through projects.
Our first project was the drainage issues on a clients yard, which was an unfortunate miss-match of large muddy low areas around the front of the property.
It was certainly interesting learning what goes into making the pipes a consistent slope.
After running water through the whole system, it really made it clear why catch basins are so important while the built up mud was building up.
With a simple project done and dusted, we moved on to the most complex of the three projects.
We built upon the frame we set up a week ago fully flushed out the finer decorative elements.
Throw in a bonus pergola we threw up in a day as a last minute addition.
And on my last day there i saw a cute little snake :)
The last project we started today.
Today we put some Amercan Holly trees in, to partially cover a structural crack while it is repaired.